-
Dia3: An optimization algorithm to assess different reserves models for open pit short term planning 8 Jul 201308/07/13 a las 22:31 hrs.2013-07-08 22:31:08
Juan L. Yarmuch G.
-
Dia1: Optimum Design of Open Pit Mines 8 Jul 201308/07/13 a las 22:29 hrs.2013-07-08 22:29:08
Juan L. Yarmuch G.
-
Dia1: Repaso Evaluacion de Proyectos 8 Jul 201308/07/13 a las 22:29 hrs.2013-07-08 22:29:08
Juan L. Yarmuch G.
-
Dia2: Rock_Engineering 8 Jul 201308/07/13 a las 22:29 hrs.2013-07-08 22:29:08
Juan L. Yarmuch G.
-
Dia2: Split shell open pit design concept 8 Jul 201308/07/13 a las 22:28 hrs.2013-07-08 22:28:08
Juan L. Yarmuch G.
-
Dia3: Cut-off grade determination for the maximum value of a small Wits-type gold mining operation 8 Jul 201308/07/13 a las 22:28 hrs.2013-07-08 22:28:08
Juan L. Yarmuch G.
-
El servicio 'Bibliografía' ha sido activado 8 Jul 201308/07/13 a las 21:33 hrs.2013-07-08 21:33:08
Juan L. Yarmuch G.
-
El servicio 'Novedades' ha sido activado 8 Jul 201308/07/13 a las 21:33 hrs.2013-07-08 21:33:08
Juan L. Yarmuch G.